Typical Scope of Work

  1. Remove existing bathroom fixtures, flooring, wall tile, damaged drywall and plaster
  2. Rough in plumbing fixtures
  3. Rough in electrical
  4. Repair/replace drywall as required
  5. Install acrylic bathtub or shower pan
  6. Install pressure balance shower control
  7. Install ceramic tile on tub/shower walls
  8. Install ceramic floor tile
  9. Install quality vanity cabinet with solid surface top
  10. Install vanity faucet
  11. Install toilet and seat
  12. Install frameless glass shower enclosure (if applicable)
  13. Install bathroom accessories: coordinated designer towel bar, towel ring, paper holder, mirror, shower curtain rod
  14. Install light fixture
  15. Paint walls, ceiling, trim